Showing posts with label Cherry. Show all posts
Showing posts with label Cherry. Show all posts

Sunday, January 1, 2012

Year in review; and some new ideas, too!

The following is a quick review of pedestrian & bike capital improvements in Laurel. The City:
  • added bike lanes on Cypress Street, including the City’s first bike box.
  • added sidewalk on 7th Street in Old Town.
  • added Laurel Lakes Drive near the Safeway.
  • added a 8’ wide hiker-biker trail on Van Dusen, south of MD 198.
  • added bike sharrows on Laurel Lakes Drive
  • widened the sidewalk on a large portion of Cherry Lane to 8’ wide.
  • Brooklyn Bridge Road was resurfaced by the County with wider shoulders near the gully. The wider shoulders make it easier on bikers and joggers.
  • MD SHa, at the City’s behest, installed sidewalk on Route 1 south of Cypress, completing the sidewalk network for the entire length of Route 1 in the City.
  • The bike lanes on 4th Street were completed
  • Bike parking was added to City Hall and to the new 5th Street Community Center.
  • Decorative period-style sign posts and sign backers were installed on parts of Main Street.
  • The crosswalks were widened on Cherry Lane at 4th Street.
Very good year for those not dependent on their cars.  Now, let’s keep up the momentum by:
  • Installing bike lanes on the Mulberry and Laurel Place to complete the north-south bike route through the entire city.  Conceptual plans have already been drawn up and can be incorporated into the CIP’s resurfacing project for both roads.
  • Updating policy and infrastructure goals/designs of the City’s Bike Masterplan.  This should be a winter-time project. I volunteer to lead the public hearings, draft  any policy changes and create the visuals, if need be.  But given that the masterplan is now attached to the City’s Uniformed Land Development Code, it is imperative to keep this plan updated and fresh.
  • Prohibit parking on Laurel Place. 
  • Consider policy changes that allow bicyclists to treat stop signs as yield signs and signals as stop signs.
  • Installing cycle-tracks on Van Dusen and buffered bike lanes on Cherry Lane.
  • Completing the 8' trail south of the dog park.
  • Planting more shade trees along existing trails.
  • Finding a way to get more bus shelters in place – too many “sticks in the ground” are posing as bus stops, without shelters or even sidewalk leading to the stop.  This needs to change if we are going to encourage alternative transportation modes.
Have a great 2012, Laurel!

Wednesday, July 27, 2011

Sidewalk widening on Cherry Lane

Next week, contractors will begin widening the sidewalk on the south side of Cherry lane from Laurel Place to Ashford Blvd.  The sidewalk will be widened from 4 feet to 9 feet.  While this stretch of Cherry receives a lot of pedestrian traffic currently, the City anticipates even more foot traffic along this route.  Further, this widening will induce even more pedestrians, joggers, bikers, etc. The growth of pedestrian traffic necessitates changes in the existing design of the road at driveway locations where pedestrians and cars will be in conflict.  To accommodate this change and to make the widened sidewalk safer for faster moving pedestrians - joggers and bikers, the City will also sharpen the curb radii at the driveway entrance for the Laurel Lakes Executive Park. See the photos below. While this change to the driveway entrance may seem trivial, it is not; here's why:  The current wide driveway entrance allows for very fast turning into and out of the executive park.  These fast turn movements:
  • Reduce the likelihood of a turning motorists seeing a passing jogger;
  • Increase the injury level of a jogger, if one is struck.
By sharpening the curb radius, we force entering and exiting vehicles to slow down as they cross the potential path of fast moving pedestrians.
Driveway to Laurel Lakes Exec. Park showing locations for new curb location

Exit from Laurel Lakes Exec. Park, showing new curb location

Entrance into Laurel Lakes Exec. Park, showing new curb location

Wednesday, March 16, 2011

Lane Striping on 4th Street

Towards the end of this week, DPW is anticipating finishing the lane striping on 4th Street from Ashford Boulevard to Cherry Lane.  The existing bike lanes will continue on for this entire segment, with access to the Gude Lake paths via the new widened median openings.

Tuesday, November 30, 2010

Navigating the Intersection of 4th and Cherry by Bike

Yesterday, the City's contractors finished resurfacing 4th Street behind the Laurel.  As soon as we can get some decent weather, DPW will stripe out the lane markings. There will be some subtle changes to the lane striping heading southbound as you approach Cherry Lane and Gude Lake.  Here is the previous lane configuration on 4th Street, with a left turn lane and a right turn lane:
Left and right turn lanes on 4th Street, heading south
Now, here is the new striping layout for the southbound approach on 4th Street.  Most notably, the bike lane that is on the right, shifts toward the middle of the approach:
New striping layout.  Representation only.  (click  for larger size)
If you're a driver, nothing changes - you will still have a left turn lane and a permissive right turn lane.  However, if you are a biker, you will take the center bike lane.  This allows you to go straight toward Gude Lake or turn left, without fear of a "right hook" collision with a car.  As shown with the green arrows, bikers can use the widened median opening on Cherry, with the widened sidewalk on Cherry and the new hiker/biker trail in order to access the paths around Gude Lake.   These new features also allow inexperienced bikers to turn left to access Laurel Place or Route 1, without having to bike on Cherry Lane (which is still legal).

Monday, November 8, 2010

Sidewalk widening on Cherry Lane

The City of Laurel is expanding the width of the sidewalk along Cherry Lane at 4th Street.  This is to accomodate both pedestrian and bikers access to the trails around Gude Lake from the newly-constructed access path down from the intersection of 4th and Cherry.  Further, it will allow cyclists on 4th Street access to the Gude Lake trails via the widened crosswalk/median-openings and expanded sidewalk. The picture below highlights some of the new and pending changes.

Yellow captions indicate new or pending changes to 4th and Cherry.

Thursday, October 14, 2010

New Pedestrian Signal Installed at Cherry Lane & Van Dusen Road

This week, the City is installing a new push-button pedestrian signal to allow for safe dedicated crossing of Cherry Lane at Van Dusen. ADA-compliant pedestrian ramps were installed on the "pork chop" island, as well as on the southeast corner, to accomodate the crossing. 

New Signalized Pedestrian Crossing at Van Dusen Road & Cherry Lane
Weather permitting, the City will install has installed a crosswalk this week  in order to finalize the crossing.  This crossing will allow pedestrians to safely cross Cherry Lane (ADT of 22,000 cars) without having to walk down to the nearest pedestrian signal at Ashford Boulevard, over a 1/4 mile away.

Friday, July 2, 2010

New Pedestrian Signal Crossing at Van Dusen & Cherry Lane

The City of Laurel is installing a new pedestrian crossing at the intersection of Van Dusen Road and Cherry Lane. 
 
The new crossing entails:
  1. Opening up the walkway width of the 'porkchop" island on the northeast corner (this will allow for extension of the Van Dusen Road Bike sidepath in a future phase);
  2. Tightening the turning radius on the south east corner and adding an extra-wide ADA compliant ramp;
  3. Installing an 8' wide ladder-style crosswalk across Cherry Lane on the east side of the intersection;
  4. Adding a pedestrian crossing signal phase and countdown timer.

 There is currently no crosswalk or pedestrian phase for residents to cross Cherry Lane at this intersection.  The new crossing desscribed above will fix this, providing students from the Wellington Developments a safer crossing to Laurel High School without having to cross at an unprotected location in front of the school, as is often the case.  It will also allow all the developments near this intersection - Laurel Oaks, Laurelton Forest, Crescents, etc. - quick and safe pedestrian access to surrounding neighborhoods.

 
Status Update:  Items 1), 2) and 3) are complete.  Item 4  is scheduled for mid-October.

Wednesday, March 24, 2010

Upcoming Improvements to 4th & Cherry

This Spring, the City will make the following improvements to the Intersection of 4th and Cherry. Together, these modification will improve pedestrian and biker access to Gude Lake and its surrounding trails.
  1. Construct a hiker/biker path from the pedestrian ramp to existing Gude Lake paths.(completed)
  2. Widen the existing sidewalk between curb cuts to allow for both bicyclists and walkers. (under construction week of 11/8/2010)
  3. Expand guard-rail openings (completed) and widen pedestrian ramps to 10 feet.
  4. Re-stripe and re-sign 4th Street for on-street Bike Lanes (partially complete).