Showing posts with label Phair. Show all posts
Showing posts with label Phair. Show all posts
Tuesday, August 31, 2010
Street Paving
This week, the City is re-paving Phair Place, 10th Street (from MD198 to West St), and the intersection of Greenview Drive and Clubhouse Blvd. The milling and resurfacing is expected to be complete this week, weather permitting. Any crosswalks and lane markings will be re-striped by DPW after the streets are resurfaced.
Tuesday, June 29, 2010
FY2011 Capital Improvement Projects Beginning
The City of Laurel has begun their FY 2011 "Street Improvements" CIP. These projects currently underway include:
- Intersection of Greenview Dr and Clubhouse Blvd
- New ADA compliant ramps;
- Resurface/re-stripe intersection;
- Resurface eastbound Clubhouse blvd. approach
- Phair Place
- Replace broken or separated sidewalk and curb-and-gutter;
- New ped crossing on north side of intersection of Phair and 10th;
- Resurface Phair Place
- 10th Street, from MD 198 to West Street
- Replace 3' sidewalk on east side of street;
- Replace broken or separated sidewalk and curb-and-gutter;
- New sidewalk and curb-and-gutter to replace existing drainage swale on west side between Phair Place and West Street;
- Resurface 10th Street
Subscribe to:
Posts (Atom)