Showing posts with label Route 1. Show all posts
Showing posts with label Route 1. Show all posts

Sunday, January 1, 2012

Year in review; and some new ideas, too!

The following is a quick review of pedestrian & bike capital improvements in Laurel. The City:
  • added bike lanes on Cypress Street, including the City’s first bike box.
  • added sidewalk on 7th Street in Old Town.
  • added Laurel Lakes Drive near the Safeway.
  • added a 8’ wide hiker-biker trail on Van Dusen, south of MD 198.
  • added bike sharrows on Laurel Lakes Drive
  • widened the sidewalk on a large portion of Cherry Lane to 8’ wide.
  • Brooklyn Bridge Road was resurfaced by the County with wider shoulders near the gully. The wider shoulders make it easier on bikers and joggers.
  • MD SHa, at the City’s behest, installed sidewalk on Route 1 south of Cypress, completing the sidewalk network for the entire length of Route 1 in the City.
  • The bike lanes on 4th Street were completed
  • Bike parking was added to City Hall and to the new 5th Street Community Center.
  • Decorative period-style sign posts and sign backers were installed on parts of Main Street.
  • The crosswalks were widened on Cherry Lane at 4th Street.
Very good year for those not dependent on their cars.  Now, let’s keep up the momentum by:
  • Installing bike lanes on the Mulberry and Laurel Place to complete the north-south bike route through the entire city.  Conceptual plans have already been drawn up and can be incorporated into the CIP’s resurfacing project for both roads.
  • Updating policy and infrastructure goals/designs of the City’s Bike Masterplan.  This should be a winter-time project. I volunteer to lead the public hearings, draft  any policy changes and create the visuals, if need be.  But given that the masterplan is now attached to the City’s Uniformed Land Development Code, it is imperative to keep this plan updated and fresh.
  • Prohibit parking on Laurel Place. 
  • Consider policy changes that allow bicyclists to treat stop signs as yield signs and signals as stop signs.
  • Installing cycle-tracks on Van Dusen and buffered bike lanes on Cherry Lane.
  • Completing the 8' trail south of the dog park.
  • Planting more shade trees along existing trails.
  • Finding a way to get more bus shelters in place – too many “sticks in the ground” are posing as bus stops, without shelters or even sidewalk leading to the stop.  This needs to change if we are going to encourage alternative transportation modes.
Have a great 2012, Laurel!

Tuesday, September 13, 2011

US Route 1 Sidewalk gap to be filled

There has been a long-standing gap in the sidewalk network along the City's main north-south commercial corridor, Route 1. This gap is the section along Route 1 in the southern part of the City between the Contee Shopping Center and the rest of the City north of Braygreen Road.  See picture below taken from the City's Bike MasterPlan.
Only sidewalk gap on Route 1.
DPW requested sidewalk from the State about a year ago.  The State obliged and is putting in a new 5' sidewalk, with a 4' buffer between the sidewalk and road. The buffer provides room for further expansion to a full fledged hiker-biker trail that meets up with the City's existing designated bike routes (and ideally will go all the way down to Muirkirk Station and College Park, one day). This new sidewalk is a big feather in the City's cap, as it completes the sidewalk network for the entire Route 1 corridor (on the west side, at least).  Well done DPW  - you've made a lot of people safer and made their trips more convenient.

On a different note, posts on this Blog will be much more infrequent, as I am no longer in the City's employ.  Hopefully, the City will grant me the opportunity to volunteer in whatever capacity I may be of service.  Thank you Laurel; it has been an honor to work for you.