Showing posts with label Van Dusen. Show all posts
Showing posts with label Van Dusen. Show all posts

Sunday, January 1, 2012

Year in review; and some new ideas, too!

The following is a quick review of pedestrian & bike capital improvements in Laurel. The City:
  • added bike lanes on Cypress Street, including the City’s first bike box.
  • added sidewalk on 7th Street in Old Town.
  • added Laurel Lakes Drive near the Safeway.
  • added a 8’ wide hiker-biker trail on Van Dusen, south of MD 198.
  • added bike sharrows on Laurel Lakes Drive
  • widened the sidewalk on a large portion of Cherry Lane to 8’ wide.
  • Brooklyn Bridge Road was resurfaced by the County with wider shoulders near the gully. The wider shoulders make it easier on bikers and joggers.
  • MD SHa, at the City’s behest, installed sidewalk on Route 1 south of Cypress, completing the sidewalk network for the entire length of Route 1 in the City.
  • The bike lanes on 4th Street were completed
  • Bike parking was added to City Hall and to the new 5th Street Community Center.
  • Decorative period-style sign posts and sign backers were installed on parts of Main Street.
  • The crosswalks were widened on Cherry Lane at 4th Street.
Very good year for those not dependent on their cars.  Now, let’s keep up the momentum by:
  • Installing bike lanes on the Mulberry and Laurel Place to complete the north-south bike route through the entire city.  Conceptual plans have already been drawn up and can be incorporated into the CIP’s resurfacing project for both roads.
  • Updating policy and infrastructure goals/designs of the City’s Bike Masterplan.  This should be a winter-time project. I volunteer to lead the public hearings, draft  any policy changes and create the visuals, if need be.  But given that the masterplan is now attached to the City’s Uniformed Land Development Code, it is imperative to keep this plan updated and fresh.
  • Prohibit parking on Laurel Place. 
  • Consider policy changes that allow bicyclists to treat stop signs as yield signs and signals as stop signs.
  • Installing cycle-tracks on Van Dusen and buffered bike lanes on Cherry Lane.
  • Completing the 8' trail south of the dog park.
  • Planting more shade trees along existing trails.
  • Finding a way to get more bus shelters in place – too many “sticks in the ground” are posing as bus stops, without shelters or even sidewalk leading to the stop.  This needs to change if we are going to encourage alternative transportation modes.
Have a great 2012, Laurel!

Thursday, August 25, 2011

Hiker-Biker Trail on Van Dusen

Contractors for the City of Laurel are putting the finishing touches on an 8-ft wide trail along Van Dusen Road, from MD 198 to North Arbory Court. Here is what the heavily-worn area looked like before:
Van Dusen, before the new hiker-biker trail
Here is what the upgrade - already lined with shade trees - looks like now:
New 8' sidewalk along Van Dusen Road
Comments from passers-by have been overwhelmingly positive!

Tuesday, April 5, 2011

New Street Lighting

DPW has ordered additional street lighting for the following three locations:
  • Ward Street
  • Van Dusen Road, just south of Erica Lane
  • Intersection of 4th and Montrose (upgraded lighting)
These additional lights should in place in about a month.

Thursday, October 14, 2010

New Pedestrian Signal Installed at Cherry Lane & Van Dusen Road

This week, the City is installing a new push-button pedestrian signal to allow for safe dedicated crossing of Cherry Lane at Van Dusen. ADA-compliant pedestrian ramps were installed on the "pork chop" island, as well as on the southeast corner, to accomodate the crossing. 

New Signalized Pedestrian Crossing at Van Dusen Road & Cherry Lane
Weather permitting, the City will install has installed a crosswalk this week  in order to finalize the crossing.  This crossing will allow pedestrians to safely cross Cherry Lane (ADT of 22,000 cars) without having to walk down to the nearest pedestrian signal at Ashford Boulevard, over a 1/4 mile away.

Tuesday, July 20, 2010

How to put in new sidewalk in a tough spot, without breaking the bank

Most of Van Dusen Road has drainage swales on both sides of the road.  These "ditches" catch rainwater runoff from the road and filter it into the earth and direct it to larger stormwater management systems.  These ditches work fine for rural roads. The problem is that Van Dusen Road has lots of development on it and lots of pedestrians - it is not rural - and it needs sidewalk.  However, one can't simply plop down sidewalk above the road-grade without redirecting the flow of water to someplace where it shouldn't be.  Retrofitting ditches with concrete piping and stormwater catch drains/basins to alleviate this becomes extraordinarily expensive. The Laurel City Department of Public Works came up with a nifty solution to install sidewalk along Van Dusen Road that utilizes the existing drainage ditches, but also builds above-grade sidewalk. The initial segment of new sidewalk to take advantage of this solution is this segment of Van Dusen Road that leads from the intersection of Cherry Lane to the entrance of the Laurel Oaks development.  As shown in the picture below, it is well traveled and in need of sidewalk, as Van Dusen also has its fair share of speeders.

The new solution involves utilizing a concrete flume, extending from a new gutter, that runs underneath the sidewalk panels, at predetermined intervals. 
The flume allows water that is caught by the gutter to exit out into the ditch, as before, yet still allows for uninterrupted sidewalk. The sidewalk panel over the flume is reinforced with 1/2" rebar, because of concrete's weak tensile strength.  This covered-flume solution has been installed along Van Dusen between Cherry Lane and Laurel Oaks for the past 2 months and appears to be working as intended.  Provided it continues to hold up well, this system allows for continuous concrete sidewalk to be installed along the remainder of Van Dusen without the prohibitive costs of brand new stormwater management systems.

Friday, July 2, 2010

New Pedestrian Signal Crossing at Van Dusen & Cherry Lane

The City of Laurel is installing a new pedestrian crossing at the intersection of Van Dusen Road and Cherry Lane
 
The new crossing entails:
  1. Opening up the walkway width of the 'porkchop" island on the northeast corner (this will allow for extension of the Van Dusen Road Bike sidepath in a future phase);
  2. Tightening the turning radius on the south east corner and adding an extra-wide ADA compliant ramp;
  3. Installing an 8' wide ladder-style crosswalk across Cherry Lane on the east side of the intersection;
  4. Adding a pedestrian crossing signal phase and countdown timer.

 There is currently no crosswalk or pedestrian phase for residents to cross Cherry Lane at this intersection.  The new crossing desscribed above will fix this, providing students from the Wellington Developments a safer crossing to Laurel High School without having to cross at an unprotected location in front of the school, as is often the case.  It will also allow all the developments near this intersection - Laurel Oaks, Laurelton Forest, Crescents, etc. - quick and safe pedestrian access to surrounding neighborhoods.

 
Status Update:  Items 1), 2) and 3) are complete.  Item 4  is scheduled for mid-October.

Monday, March 8, 2010

Sidewalk Repair Contract Starts up Again

After a long weather-induced hiatus, the current sidewalk repair contract has re-started this week.  This contract will also cover:

Friday, October 23, 2009

New Sidewalk along Van Dusen Road

The City of Laurel will be installing new sidewalk and curb-and-gutter along Van Dusen Road between Cherry Lane and Laurel Oaks Lane. Van Dusen has a high number of speeders, and there is currently no sidewalk along this segment. This segment is heavily used by pedestrians (primarily by school children), as evident by the path worn out in the grass along the road's shoulder. As shown in the figure below, this new sidewalk will connect the private sidewalk adjacent to the condominiums on Laurel Oaks Lane with the sidewalk along Cherry Lane, allowing residents a safer and more convenient passage.

Sunday, June 14, 2009

Current or Pending Pedestrian Safety Improvements (updated weekly)

4th Street

  • ADA compliant sidewalk ramps
  • Repair broken and uneven sidewalk


    High Visibility Decorative Crosswalks at multiple Locations
  • Pedestrian Crosswalk Locator Signs
Update: Completed July, 2009

8th Street


  • ADA compliant sidewalk ramps
  • Repair broken and uneven sidewalk
  • High-visibility crosswalks at McCullagh Field
Update: Complete

9th Street

  • ADA compliant sidewalk ramps
  • Repair broken and uneven sidewalk
Update: Completed July, 2009


10th Street


  • ADA compliant sidewalk ramps
  • Repair broken and uneven sidewalk
Update: Completed July, 2009

Alan Drive

  • Repair broken and uneven sidewalk
  • ADA compliant sidewalk ramps
Update: Completed July, 2009

Carrissa Lane


  • ADA compliant sidewalk ramps
  • Repair broken and uneven sidewalk
Update: Completed July, 2009

Dorset Road
  • ADA compliant sidewalk ramps at crosswalks in front of Scotchtown Hills Elementary School
Update: Completed

Fairlawn Ave

  • ADA compliant sidewalk ramps
  • Repair broken and uneven sidewalk
Update: Completed July, 2009


Greenview Drive

  • High Visibility Crosswalks at Clubhouse Lan
  • Pedestrian Crosswalk Locator Sign
  • Striping for parking lane to address traffic calming
See Figure 1 for illustration.

Update: Complete

Kalmia Drive

  • ADA compliant sidewalk ramps
  • High Visibility Crosswalks at Erica Lane


  • Repair broken and uneven sidewalk
Update: Completed July, 2009

KillBarron Road


  • Complete Sidewalk on north side to Van Dusen Roadpedestrian side path. See Figure 2.


Update: Completed July, 2009

Lafayette Street

  • ADA compliant sidewalk ramps
  • Repair broken and uneven sidewalk

Update: Completed July, 2009

Laurel Oaks Lane



  • ADA compliant sidewalk ramps



  • Repair broken and uneven sidewalk



    Update: Completed July, 2009

Laurelton Drive


  • ADA compliant sidewalk ramps
  • Repair broken and uneven sidewalk

Update: Completed July, 2009

Main Street


Update: Completed - Spring 2010

Montgomery Street


  • Traffic Calming near 10th Street. See Figure 10.
  • ADA compliant sidewalk ramps
  • Repair broken and uneven sidewalk
  • Traffic Calming at 11th Street. See Figure 11.
Update: Completed
 
Montrose Ave


Update: Completed

St. Mary’s Ave

  • ADA compliant sidewalk ramps
  • Repair broken and uneven sidewalk
  • High Visibility Decorative Crosswalks at multiple Locations
Update: Complete.

Van Dusen Road
  • Countdown Pedestrian Signal (CPS) and Audible Pedestrian Signal (APS) at intersection with Killbarron Road. See Figure 3. Completed September 2009
  • Countdown Pedestrian Signal (CPS) and Audible Pedestrian Signal (APS) at intersection with Cherry Lane. See Figure 9Update: Completed July,2009
  • High-Visibility Crosswalk at Killbarron Drive. Update: Completed August 2009
Ward Street


  • ADA compliant sidewalk ramps
  • Repair broken and uneven sidewalk
Update: Complete


FIGURES
Figure 1: Proposed striping/signage improvements to the intersection of Clubhouse and Greenview
Figure 2: Missing Sidewalk on Killbarron (before) and New Sidewalk leading up to the asphalt path on Van Dusen (after).
Figure 3: Intersection of Van Dusen and Olive Branch/Killbarron
Figure 4: Illustration of bulb-outs at Main and 5th.
Figure 5: High-visibility thermo-plastic crosswalks.

Figure 6: Illustration of new Decorative Crosswalk
Figure 7: Before-and-after conditions showing concrete islands for traffic circle and new circle striping. Not to scale.
Figure 8: Relocated pedestrian ramp and new crosswalk and signage.
Figure 9: Van Dusen and Cherry. Installation of new Pedestrian Countdown Signal (PCS) and new Audible Pedestrian Signal (APS)
Figure 10: Rendering of the Intersection of Montgomery Street and Sandy Spring, with realigned decorative crosswalks and bulb-outs to reduce pedestrian crossing distance and calm vehicle traffic.


Figure 11: Rendering of the Intersection of Montgomery Street and 11th, with traffic calming center island and high-visibility crosswalk.